Alumax P-DR1W-48-60 Manuel d'utilisateur Page 5

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 14
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 4
5
GASKET INSTALLATION
1
1B
1A
Place door panel (6) inside tub to simplify following
installation procedures. Ensure placing the panel
onto a cushioned surface, such as a towel or card
board, to prevent damage either to the panel or
the tub.
Using the cardboard packaging box as platform,
install bottom door gasket (17) onto door panel
(6) using a block and a mallet. Notice the gasket
orientation.
1B
Thoroughly clean the edge of the xed panel (7).
Split the door gasket (9) in two and apply the
smaller half of the gasket on the edge of the xed
panel.
7
6
17
6
1A
INTERIOR
SHOWER SIDE
INTERIOR
SHOWER SIDE
10
Vue de la page 4
1 2 3 4 5 6 7 8 9 10 ... 13 14

Commentaires sur ces manuels

Pas de commentaire